[Construction Example] Restoration Work of a Wooden House in Mihama 3-chome, Urayasu City, Chiba Prefecture

It was a satisfactory construction project! Here is an introduction to a case study of a wooden house slope restoration work.

Here is a case study of a wooden house slope restoration project. "Settlement correction work and liquefaction countermeasures are different things." "You must not abuse the foundation and the ground." "A shorter construction period is better." Based on these three points, we received the request from our client. We constructed a flat foundation over an area of 89m2 using a multi-point interval method. The construction period was 12 days. As a result, the work was satisfactory, and we received words of gratitude such as, "Each role was clear, and there was no waste in the flow of the entire construction process." [Case Overview] ■ Location: Mihama, Urayasu City, Chiba Prefecture ■ Building Name: Residence ■ Structure and Scale: Two-story wooden house ■ Foundation Structure: Flat foundation ■ Total Restoration Weight: Approximately 60 t *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Renovation and repair methods
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Restoration of Office Building Ground Subsidence Due to the Hanshin-Awaji Earthquake

Restoration of office building subsidence! We will introduce an example of a building with 6 floors above ground and 1 basement level.

In the Great Hanshin-Awaji Earthquake, localized loosening occurred in the foundation of office buildings due to liquefaction and intense vibrations over a wide area of the coastal region, and we restored the areas that had sunk. We entered the underground pit (900mm) from the opening on the first basement floor and drilled holes. Additionally, since the groundwater level is at GL-1.0m, we installed injection pipes while performing water stop injections for the pressurized water. Due to the irregular shape of the building, we measured the uplift both externally and internally to confirm any bulging, and we applied JOG to prevent distortion. 【Case Overview】 ■ Location: 2-chome, Sakaemachi, Chuo Ward, Kobe City ■ Building Name: Office Building ■ Structure and Scale: RC structure, 1 basement floor, 6 above-ground floors ■ Foundation Structure: Slab foundation ■ Total Restoration Weight: Approximately 3,500t *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Renovation and repair methods
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration